Saltar al contenido

SharePLM

logo Orienteed 2025

ORIENTEED & SHAREPLM STRATEGIC PARTNERSHIP

PLM technology only works when people adopt it.

Industrial & Manufacturing Specialists

Guaranteed Adoption

Teamcenter & Cortona3D Implementation

Why Product Lifecycle Management Initiatives Fail

Most PLM projects fail to achieve their expected ROI due to two root causes: a lack of team adoption or poor technical architecture and integration.

Our joint solution brings together the best of both worlds:

Dimension

Responsible Partner

Strategic Approach

Methodology & People

SharePLM

Green Check

Change enablement, hands-on training, communication, usability (UX), and cultural alignment to ensure users adopt the system from day one.

Technology & Integration

Orienteed

Green Check

Technical architecture and implementation (Teamcenter, Cortona3D), data structuring, product configuration, Model-Based Definition (MBD), and system migration.

 From Adoption Strategy to Flawless Technical Execution

aumento

Increased System Adoption (+50%):

Change management strategies designed by SharePLM that reduce team resistance and accelerate time-to-value.

gestión

Product Data Management & Centralization

Data structuring powered by Siemens Teamcenter (Active Workspace), product tree hierarchy, and automated Change Management workflows.

documentación

Interactive Technical Documentation

Cortona3D integration (RapidAuthor and RapidCatalog) to create interactive catalogs, manuals, and spare parts list directly connected to engineering data.

Streamlined Workflows

Alignment of processes across engineering, production, maintenance, and operations without creating organizational silos.

Frequently Asked Questions

How do Orienteed and SharePLM collaborate on an industrial project?

SharePLM acts as the expert partner in change management, training, and usability, ensuring that personnel use the tool with confidence. Orienteed acts as the technology partner in charge of technical design, configuration, PLM software integration (such as Teamcenter or Cortona3D), and system migration.

Why is change management critical in PLM implementations?

Because PLM fundamentally changes how engineering and operations teams work, their roles, and their daily habits. Without a structured adoption program, even the best technology fails due to resistance or improper data usage.

SharePLM

STRATEGIC SESSION

Book a session
30 minutes

Ensure the success of your PLM project—from technology to people. Request a joint evaluation session with SharePLM consultants and Orienteed solution architects.

check

Digital transformation management.

check

Interactive technical documentation.

check

Industrial and manufacturing specialization.